Saturday, January 24, 2015

Bottoms up

Week Two
Job: Scrap the bottom of the boat.
 


 
 


 
 

 
 

Monday, January 12, 2015

She's In

On January 6th Vérité was moved from her outdoor location to the Foss Waterway Seaport. For the months of January and February she will be cleaned, scrubbed, sanded, painted, and repaired. Today Monday, January 12 a team scrubbed her inside and out and the scrapping began and the to-do list made. With luck and teamwork all should be accomplished. With good lighting, warm water we're in heaven. Take a look at these digs: Thank You Foss Waterway!









 
Monday, January 12, 2015






A park bench becomes spot for tea and snack at the end of a productive day.